比较装备

选择最多 4 个装备项目以并排比较它们的规格

选择装备
概述
Image
杰拉尔德·R·福特号(CVN-78)
福建
伊丽莎白女王号航空母舰
名称杰拉尔德·R·福特号(CVN-78)福建伊丽莎白女王号航空母舰
类别航空母舰航空母舰航空母舰
国家 / 来源
制造商Huntington Ingalls Industries Newport News ShipbuildingJiangnan Shipyard-
服务期限2017 – 呈现2022 – 呈现2017 – 呈现
技术规格
Air Wing-J-15T, J-15DT, J-35, KJ-600 AEW&C, Z-20F and Z-18 series helicopters-
Air Wing Capacity75+ aircraft typically embarked; design capacity up to ~90 (F/A-18E/F, F-35C, EA-18G, E-2D, MH-60R/S, CMV-22B)--
Aircraft Capacity--60
Aircraft Types--fixed wing, rotary wing and autonomous vehicles
Arresting GearGeneral Atomics Advanced Arresting Gear (AAG), water-twister and electromagnetic energy absorption, 3 cross-deck pendants--
Beam M40.847639
Builder-Jiangnan Shipyard (Group) Co., Changxing Island, Shanghai-
Catapult System4 x General Atomics EMALS electromagnetic launch tracks (replaces C-13 steam catapults)--
Catapult Type-Electromagnetic aircraft launch system (EMALS), 3 catapults; medium-voltage direct-current shipboard power (reported)-
Catapults430
Commissioned-5 November 2025 at the naval base in Sanya, Hainan-
Crew4540-679
Crew Complement-~5,000 including air wing (est.)-
Displacement Tons1000008000080600
Full Load Displacement-~80,000-85,000 t (est.)-
Home Port-Sanya, Hainan - Southern Theater Command Navy-
Hull Number-18-
Launch SystemCATOBARCATOBARSTOVL
Length M337316284
Procurement Cost~US$13.3 bn end cost (then-year dollars) against a ~US$10.5 bn initial estimate (reported)--
PropulsionnuclearconventionalGE Integrated electric propulsion powered by two Rolls-Royce Marine 36 MW MT30 gas turbine alternators and four 10 MW diesel engines
RadarDual Band Radar: AN/SPY-3 X-band multifunction array plus AN/SPY-4 S-band volume-search array (CVN-78 only; later hulls switch to EASR)--
Reactors2 x Bechtel A1B pressurised-water reactors, 4 shafts; roughly 150% of Nimitz-class electrical generation and distribution capacity--
Sortie Generation Rate160 sorties/day sustained and 270/day surge (design goal, reported); 167 launches and recoveries flown in one day in May 2020--
Speed Knots30-25
Weapons Elevators11 electromagnetic Advanced Weapons Elevators; final unit turned over to the crew in December 2021--