U.S. "Ford" Class Aircraft Carrier Successfully Completes F-35C Takeoff and Landing for the First Time
Reference News Network reported on November 23 According to the U.S. Defense News weekly website on November 19, Lockheed Martin announced on the 19th that two U.S. Navy F-35C Lightning II fighter jets have completed their first round of catapult launches and arrested landings on the USS John F. Kennedy, which has not yet officially entered service. This ship is the second Ford-class aircraft carrier of the U.S. Navy.
Lockheed Martin stated that during the tests that began on October 13, these two aircraft executed a total of 34 flights, completing 122 catapult launches and 122 arrested landings. These two planes belong to the Navy's Air Test and Evaluation Squadron 23, stationed at Naval Air Station Patuxent River in Maryland.
According to the U.S. Navy, these flights are part of the carrier compatibility testing for the USS John F. Kennedy, aimed at assessing the coordination between the ship's launch and recovery systems and Navy aircraft. Images released by the Navy indicate that the first arrested landing occurred on October 13, and the first catapult launch took place on October 14.
Unlike the Nimitz-class carriers that use steam catapults and hydraulic arresting gear, the Ford-class carriers employ an Electromagnetic Aircraft Launch System (EMALS) and advanced arresting gear. Lockheed Martin stated that the EMALS allows for smoother and more precisely controlled launches, while the advanced arresting gear can handle a wider range of recovery conditions.
The island of the Ford-class carrier (the tower structure that houses the bridge and flight control tower) is also smaller, positioned approximately 140 feet (1 foot is about 0.3 meters) further aft than that of the Nimitz-class carriers. Lockheed Martin noted that the island and redesigned flight deck have altered airflow and deck operations.
The company stated that this at-sea testing follows land-based tests conducted from January 2024 to May 2025. The tests validated the structural model of the aircraft and examined the software and equipment behind the EMALS and advanced arresting gear. This data will assist in developing operational guidelines for personnel using the launch and recovery systems on the Ford-class carriers.
Sean Jackson, Vice President of the F-35 Development Program at Lockheed Martin, said, “This is a key event for the F-35C, the USS John F. Kennedy, and the U.S. Navy. This aircraft has demonstrated for the first time catapult launches and arrested recovery operations on the Gerald R. Ford-class carrier flight deck.”
Jackson also stated that after completing this testing phase, “the U.S. Navy has now approved the F-35C to operate across its entire carrier fleet.”
An official from Lockheed Martin told Defense News reporters, “Once the catapult and recovery notifications are issued, each ship will be authorized to launch and recover the F-35C. However, they are not yet deployable until fully equipped with support equipment.”
The official also mentioned that the U.S. Navy has “final approval authority.”
In November 2014, the F-35C made its first landing on an aircraft carrier, at that time on the USS Nimitz, and since then the model has been deployed on modified Nimitz-class carriers. The lead ship of the Ford-class carriers, the USS Gerald R. Ford, has not yet deployed this model.
In 2019, a Navy spokesperson told reporters from the U.S. Naval Institute News that both classes of carriers were designed to operate the F-35C, but some modifications were needed, such as stronger jet deflector panels and secure spaces, to enable the model to operate more effectively in full deployment. The Stars and Stripes reported that the U.S. Navy plans to modify the USS Ford to operate the F-35C.
The USS John F. Kennedy has incorporated these modifications during its construction. In 2020, the U.S. Navy amended the ship's construction contract to meet a legislative requirement that the USS John F. Kennedy must be capable of deploying the F-35C.
After the USS John F. Kennedy completed its acceptance trials in August, the U.S. Navy conducted a preliminary acceptance on September 29. The preliminary acceptance allows the crew to conduct testing and training at sea while completing remaining work at the shipyard. At that time, the U.S. Navy stated that the ship was approximately 99% complete, with formal delivery planned for spring 2027. (Translated by Lu Di)
Two F-35C Lightning II aircraft completed their first round of catapult launches and arrested landings on the USS John F. Kennedy on October 13-14, 2023. This testing is part of the carrier's compatibility assessments and involved 34 flights. The USS John F. Kennedy is the second Ford-class aircraft carrier, and the U.S. Navy has approved F-35C operations across its fleet following these tests.
- Two F-35C aircraft completed testing on USS John F. Kennedy.
- The tests included 34 flights, 122 catapult launches, and 122 arrested landings.
- The USS John F. Kennedy is the second Ford-class aircraft carrier.
- Testing was part of compatibility assessments for the carrier's systems.
- The U.S. Navy has approved F-35C operations across its carrier fleet.