Fincantieri to lead the upgrade of PPA units to the Full Combat System configuration

Report Content

22 April 2026 – A Contractual Integration to the PPA – Multipurpose Combat Ship program has been signed, aimed at upgrading the PPA-class vessels to the Full Combat System configuration.

The Agreement was signed by the Director of OCCAR-EA and by Fulvio Palermo, Head of Project Management of Fincantieri’s Naval Vessels Division, representing the Temporary Consortium formed by Fincantieri and Leonardo.

The agreement provides for the implementation of the necessary adaptation activities to enable the upgrade of PPA-class units from the “Light” and “Light Plus” configurations to the “Full Combat System” configuration, as well as the introduction of advanced capabilities in the cyber defense domain. For Fincantieri’s share, the overall value of the activities amounts to approximately €62 million.

The activities, coordinated by Fincantieri, will involve both vessels already delivered and units currently under construction and outfitting, ensuring alignment of the entire PPA class with the most advanced operational configuration.

The PPA – Multipurpose Combat Ship program represents a highly flexible type of vessel, designed according to a “fitted for” approach that enables the progressive integration of operational capabilities. These units are capable of performing a wide range of missions, from patrol duties with search and rescue capabilities to combat operations, thanks to a scalable combat system that evolves from lighter configurations to the full one.

With this initiative, Fincantieri further strengthens its role within the PPA program, reaffirming the Group’s positioning in the development and upgrade of highly complex, technologically advanced naval platforms, in line with the operational requirements of the Italian Navy.

Photo courtesy Fincantieri

Content preview only. Full article available at source. View Full Article

Classification
Region
Europe
Analytical Domain
Operational
Primary Category / Secondary Categories
Weapons & Equipment / Logistics
Subcategory
New Weapon System
SALUTE Report
Size
Not specified
Activity
Upgrade of PPA-class vessels to Full Combat System configuration
Location
Italy
Unit
Fincantieri and Leonardo
Time
22 April 2026
Equipment
PPA-class vesselscyber defense capabilities
Summary

Fincantieri signed a contract on 22 April 2026 to upgrade PPA-class vessels to the Full Combat System configuration. This initiative, valued at approximately €62 million, will enhance both delivered and under-construction units with advanced capabilities, including cyber defense. The upgrade aims to align the PPA class with the Italian Navy's operational requirements.

Key Facts
  • A contract was signed for upgrading PPA-class vessels.
  • The upgrade will enhance capabilities to Full Combat System configuration.
  • The total value of the upgrade activities is approximately €62 million.
  • The upgrade involves both delivered vessels and those under construction.
  • Fincantieri is leading the upgrade in collaboration with Leonardo.