Missouri airbase adds weapons storage building for incoming B-21s

Report Content

The U.S. Army Corps of Engineers awarded K & K Industries a $13.6 million contract to build a weapons release system storage facility at Whiteman Air Force Base, Missouri, part of the base’s preparation to host the B-21 Raider stealth bomber. The Windsor, Missouri-based company’s firm-fixed-price award brings the project’s total value to $14,993,485.

Three companies bid on the project. Work will be done in Knob Noster, Missouri, the town adjacent to Whiteman, with an estimated completion date of March 31, 2028. The Army obligated $13,649,923 in fiscal 2026 military construction funds at the time of the award. The Kansas City District of the Army Corps of Engineers is managing the contract.

The facility will give Whiteman dedicated space to store and support armament-related equipment for the B-21, according to Air Force documentation on the project. It includes a new weapons and release-system shop covering about 1,580 square meters (17,000 square feet), along with alterations to roughly 674 square meters (7,250 square feet) of existing space, plus utilities, communications, access routes and site preparation work. Air Force documents describing the project say Whiteman currently lacks enough room to handle the munitions-related parts and equipment expected to arrive with the bomber.

Whiteman is home to the Air Force’s current B-2 Spirit fleet and is set to become the second operational base for the B-21, after Ellsworth Air Force Base in South Dakota. The Air Force has said the new facility will let the base keep running B-2 operations without competing for existing infrastructure as B-21 support work ramps up.

This is one of roughly 30 military construction projects planned at Whiteman for the B-21 program, together valued at about $900 million, according to slides the Army Corps of Engineers presented at an industry day in September. Those projects include a dormitory and a radio-frequency hangar in addition to the weapons storage facility, with a weapons load trainer facility and a sustainment complex planned for awards in fiscal 2027.

The Army Corps separately awarded Conti Federal Services $74.8 million this month to build a radio-frequency and measurements hangar at Whiteman, a facility designed to check whether the B-21’s low-observable coatings and stealth characteristics hold up after maintenance or repairs. That hangar is scheduled for completion in September 2029.

Content preview only. Full article available at source. View Full Article

Classification
Region
North America
Analytical Domain
Operational
Primary Category / Secondary Categories
Logistics / Weapons & Equipment
SALUTE Report
Size
Not specified
Activity
Construction of a weapons storage facility
Location
Whiteman Air Force Base · Knob Noster · Missouri
Unit
U.S. Army Corps of Engineers
Time
Contract awarded
Equipment
weapons release system storage facilityB-21 Raider stealth bomber
Summary

The U.S. Army Corps of Engineers awarded a $13.6 million contract to K & K Industries for the construction of a weapons storage facility at Whiteman Air Force Base, Missouri. This facility will support the incoming B-21 Raider stealth bomber and is expected to be completed by March 31, 2028. The project is part of a larger $900 million investment in military construction at the base, which will enhance its operational capabilities.

Key Facts
  • U.S. Army Corps of Engineers awarded a $13.6 million contract to K & K Industries.
  • The facility will support the B-21 Raider stealth bomber.
  • Construction is set to be completed by March 31, 2028.
  • The project is part of a $900 million investment in military construction at Whiteman.
  • The facility will provide dedicated space for munitions-related equipment.