U.S. Navy pays Boeing to plan Super Hornet line shutdown

Report Content

The U.S. Navy has paid Boeing $16.7 million to plan the shutdown of the F/A-18E/F Super Hornet and EA-18G Growler production lines, including a full inventory of the government-owned tools and equipment used to build the jets.

The firm-fixed-price order, placed by Naval Air Systems Command against an existing Boeing ordering agreement, covers planning, analysis, engineering and program management for closing the lines. Boeing will catalog and assess the tooling and production equipment, recommend what should be kept, stored or disposed of, and deliver a master property inventory and disposition plan. The work runs until November 2030.

The U.S. Navy announced the order on Sept. 29, the same day it picked Boeing to develop the F/A-XX, the sixth-generation carrier fighter meant to eventually replace both the Super Hornet and the Growler. The shutdown order was not competed and is funded entirely with fiscal 2024 Navy aircraft procurement money.

About 60% of the work will take place in St. Louis, where Boeing assembles the Super Hornet. Another 37% is set for El Segundo, California, where Northrop Grumman has long built the center and aft fuselage sections for the F/A-18E/F and EA-18G, and 3% for Bethpage, New York, where Northrop Grumman integrated the Growler’s electronic attack systems.

New Super Hornet production is already close to its end. The U.S. Navy placed its last order, for 17 Block III jets, in 2024 after Congress funded the aircraft, pushing the planned closure of the St. Louis line from 2025 to 2027. Final deliveries are expected by spring 2027.

Northrop Grumman finished the last fuselage sections and vertical tails for those jets last year, and Boeing confirmed it no longer builds the Growler, The War Zone reported in January. Growler production ended after the U.S. Navy and Australian orders were completed in the late 2010s, with the U.S. Navy buying 160 of the electronic warfare jets.

Both aircraft will stay in service for years after the lines close. Boeing’s Service Life Modification program, which adds Block III upgrades and 4,000 flight hours to older Super Hornets, is projected to continue into the mid-2030s, though Boeing is moving that work out of St. Louis to San Antonio and Fleet Readiness Center Southwest by 2027. The U.S. Navy plans to keep the Growler flying until 2046.

The F/A-XX will not arrive quickly enough to replace either jet soon. The Pentagon said the new fighter will begin to augment and eventually replace Super Hornets and Growlers in the 2030s.

The contract notice does not say how much tooling the U.S. Navy owns across the three sites, or whether any of it will be kept to produce spare parts for the fleet after the last new jet is delivered.

Content preview only. Full article available at source. View Full Article

Classification
Region
North America
Analytical Domain
Operational
Primary Category / Secondary Categories
Weapons & Equipment / Logistics
SALUTE Report
Size
N/A
Activity
U.S. Navy has contracted Boeing to plan the shutdown of Super Hornet and Growler production lines, including inventory management of tools and equipment.
Location
St. Louis · El Segundo · Bethpage
Unit
U.S. Navy, Boeing, Northrop Grumman
Time
Contract announced on September 29, 2023, work runs until November 2030.
Equipment
F/A-18E/F Super HornetEA-18G GrowlerBlock III jets
Summary

The U.S. Navy has contracted Boeing for $16.7 million to plan the shutdown of the F/A-18E/F Super Hornet and EA-18G Growler production lines, with work running until November 2030. The contract includes inventory management of tools and equipment across St. Louis, El Segundo, and Bethpage. Final deliveries of Super Hornets are expected by spring 2027, while the F/A-XX is set to replace these aircraft in the 2030s.

Key Facts
  • U.S. Navy paid Boeing $16.7 million for planning the shutdown of Super Hornet and Growler production lines.
  • The work includes cataloging and assessing tooling and production equipment until November 2030.
  • 60% of the work will occur in St. Louis, 37% in El Segundo, and 3% in Bethpage.
  • Final deliveries of Super Hornets are expected by spring 2027, with Growler production having ended in the late 2010s.
  • The F/A-XX is planned to replace both aircraft in the 2030s.