USS Gerald R. Ford (CVN-78)

🇺🇸United States
Huntington Ingalls Industries Newport News Shipbuilding
2017 – Present
Spotlight

Lead Ford-class carrier: electromagnetic catapults, A1B reactors, a decade of maturation

USS Gerald R Ford: Life on board the world's biggest warship (BFBS Forces News)

Watch on YouTube
Overview
USS Gerald R. Ford (CVN-78) - Image 1
USS Gerald R. Ford (CVN-78) - Image 2
USS Gerald R. Ford (CVN-78) - Image 3
USS Gerald R. Ford (CVN-78) - Image 4
USS Gerald R. Ford (CVN-78) - Image 5
USS Gerald R. Ford (CVN-78) - Image 6
USS Gerald R. Ford (CVN-78) - Image 7
The USS Gerald R. Ford (CVN-78) is a nuclear-powered aircraft carrier and the lead ship of its class. It is designed to replace the Nimitz-class carriers and features numerous technological advancements, including the Electromagnetic Aircraft Launch System (EMALS) and Advanced Arresting Gear (AAG). The carrier is capable of generating more aircraft sorties per day and operates with a smaller crew compared to its predecessors.
Specifications

General

Crew4,540
Beam M40.84 m
Length M337 m
Catapults4
Propulsionnuclear
Speed Knots30 knots
Launch SystemCATOBAR
Displacement Tons100,000 tons

Other

RadarDual Band Radar: AN/SPY-3 X-band multifunction array plus AN/SPY-4 S-band volume-search array (CVN-78 only; later hulls switch to EASR)
Reactors2 x Bechtel A1B pressurised-water reactors, 4 shafts; roughly 150% of Nimitz-class electrical generation and distribution capacity
Arresting GearGeneral Atomics Advanced Arresting Gear (AAG), water-twister and electromagnetic energy absorption, 3 cross-deck pendants
Catapult System4 x General Atomics EMALS electromagnetic launch tracks (replaces C-13 steam catapults)
Procurement Cost~US$13.3 bn end cost (then-year dollars) against a ~US$10.5 bn initial estimate (reported)
Air Wing Capacity75+ aircraft typically embarked; design capacity up to ~90 (F/A-18E/F, F-35C, EA-18G, E-2D, MH-60R/S, CMV-22B)
Weapons Elevators11 electromagnetic Advanced Weapons Elevators; final unit turned over to the crew in December 2021
Sortie Generation Rate160 sorties/day sustained and 270/day surge (design goal, reported); 167 launches and recoveries flown in one day in May 2020
Latest Developments
Oct 16, 2026strong signal
The Navy’s Newest Aircraft Carrier Could Not Handle Its Newest Fighter: The F-35C’s 3,600°F Exhaust Was Too Hot for USS Gerald R. Ford’s Flight Deck as Built

the USS Gerald R. Ford’s jet blast deflectors and associated deck infrastructure require reinforced materials and upgraded cooling to withstand the high-tempo launches of F-35Cs

Oct 14, 2026strong signal
100,000-Ton Navy Nuclear Aircraft Carrier USS Gerald R. Ford Has a ‘Math Problem’ That Can’t Seem to Be Solved

USS Gerald R. Ford (CVN-78) will return to the fleet after just six months in the yard.

Sep 2, 2026strong signal
The Ford-Class Nuclear Aircraft Carrier “Is One of the Most Expensive Bets Ever Made by a Navy”

The Ford-class aircraft carrier USS Gerald R. Ford (CVN 78) and the Italian aircraft carrier ITS Cavour (CVH 550) transit the Atlantic Ocean March 20, 2021, marking the first time a Ford-class and Italian carrier have operated together underway.

Aug 7, 2026strong signal
The F-35C’s Engine Exhaust Totals 3,600°F — US Navy Gerald R. Ford’s Aircraft Carrier Flight Deck Would Melt Under Such Stress

The USS Gerald R. Ford (CVN-78) was proclaimed as America’s most advanced aircraft carrier.

May 1, 2026strong signal
Three Carriers, One Strait: How America's Largest Middle East Naval Buildup Since 2003 Is Reshaping Gulf Security

The USS Gerald R. Ford (CVN-78) is currently operating in the Red Sea after undergoing emergency repairs in Croatia following a laundry room fire in March.

Apr 28, 2026strong signal
‘Reaching Nightmarish-Levels’: A Zumwalt-Class ‘Stealth’ Destroyer Caught Fire and The U.S. Navy Has a New Problem to Deal With

the Ford could be out of action for 12 to 14 months due to this fire.

Apr 24, 2026strong signal
The U.S. Navy’s USS Gerald R. Ford Aircraft Carrier: The Bill Is About to Come Due for That ‘Record Deployment’

the United States Navy nuclear-powered aircraft carrier USS Gerald R. Ford (CVN-78), operating as the lead ship of the Ford-class of next-generation aircraft carriers intended to replace the aging Nimitz-class fleet, has now been deployed continuously for 295 days across the Atlantic Ocean, the Caribbean near Venezuela, the eastern Mediterranean Sea, the Red Sea, and operations supporting the ongoing war against the Islamic Republic of Iran.

Apr 15, 2026strong signal
The USS Gerald R. Ford Has a Message for the U.S. Navy: It’s Been at Sea for 295 Rough Days

The USS Gerald R. Ford (CVN-78) is the lead ship of the U.S. Navy ‘s Ford-class nuclear-powered supercarriers.

Featured Coverage
Research Notes

Lead ship of the Ford-class carrier generation

high

USS Gerald R. Ford is the first ship of a new U.S. nuclear carrier class built to replace Enterprise and eventually succeed the Nimitz-class fleet.

USS Gerald R. Ford (CVN-78) is the lead ship of the Ford-class aircraft carrier program and the first new U.S. carrier class in decades. The U.S. Navy identifies Ford-class carriers as successors to the Nimitz-class fleet, with CVN-78 delivered as the force-structure replacement for USS Enterprise.

As a lead ship, CVN-78 is both an operational warship and a technology transition platform. It introduced new launch, recovery, power-generation, weapons-handling, and ship-control systems intended to support a more efficient carrier air wing over a roughly 50-year service life.

That lead-ship role matters for interpretation. Some of the Ford page should explain capability; some should explain program risk. The first ship carried the cost and schedule burden of integrating new systems that later ships are expected to benefit from through lessons learned.

Carrier airfield, power projection, and strike-group role

high

CVN-78 is not just a ship record: it is a mobile airfield, command node, and centerpiece of a carrier strike group.

The U.S. Navy describes aircraft carriers as adaptable and survivable airfields able to control the sea, conduct strikes, and operate across the electromagnetic spectrum and cyberspace. In practice, CVN-78's value comes from the combination of the ship, its air wing, escorts, logistics force, trained crew, and command network.

The Ford-class design is intended to improve sortie generation, electrical capacity, automation, and long-term maintainability compared with older carrier designs. The ship's operational meaning is therefore not limited to displacement or aircraft count; it also depends on launch-and-recovery reliability, weapons movement, maintenance tempo, and the availability of an embarked air wing.

For readers, the central concept is sea-based air power. A carrier can move a large aviation package without requiring host-nation air bases, but it also requires a major escort and logistics system to operate safely in contested waters.

New systems and lead-ship oversight issues

high

Ford-class capability claims need to be read alongside cost, reliability, weapons elevator, and deployment-delay oversight.

CRS reporting shows why CVN-78 should be treated as both a capability page and an acquisition case study. The ship was commissioned in 2017, but its first deployment was delayed while the Navy worked through weapons elevator completion and other technical issues.

Those issues do not erase the ship's importance, but they do change how the page should explain it. New carrier technologies may offer higher output and lower long-term manning or maintenance burdens, yet first-of-class integration can produce cost growth, testing problems, and schedule delays.

A useful HiWars record should therefore avoid simple superlatives. CVN-78 is one of the most consequential warships in service, but readers also need the program context: what was new, what created delays, how later ships may incorporate lessons, and which parts of the public record are oversight findings rather than manufacturer or service messaging.

How to interpret carrier capability

high

Carrier capability is an ecosystem measurement: ship, air wing, escorts, munitions, logistics, maintenance, and political access all matter.

A carrier's practical power depends on more than the hull. CVN-78 requires a trained crew, functioning launch-and-recovery systems, an embarked carrier air wing, escorts for air and missile defense, submarines and logistics ships, munitions stocks, and maintenance capacity.

This makes carrier comparison difficult. A large carrier may have enormous potential, but operational output depends on aircraft readiness, sortie cycle, escort availability, supply routes, threat environment, and the political decision to place the strike group near a crisis.

For HiWars, the most helpful framing is to treat USS Gerald R. Ford as a platform inside a larger force package. Future updates should connect the ship page to carrier air wing composition, deployments, maintenance periods, strike-group escorts, and Ford-class follow-on ships.

Key parameters at a glance

high

Hull, propulsion and manning figures follow published US Navy and builder data; sortie-rate numbers are design goals and are marked as reported.

Role
Nuclear-powered CATOBAR supercarrier, lead ship of the Ford class
Builder
HII Newport News Shipbuilding; commissioned July 2017
Full-load displacement
~100,000long tons
Length overall
337m (1,106 ft); flight deck ~78 m wide
Propulsion
2 x A1B reactors, 4 shafts, 30+ knots
Launch and recovery
4 x EMALS electromagnetic catapults, Advanced Arresting Gear
Weapons handling
11 electromagnetic Advanced Weapons Elevators, completed December 2021
Air wing
75+ aircraft embarked, design capacity up to ~90
Sortie generation
160/day sustained, 270/day surge (design goal, reported); 167 launch-recovery cycles in one day, May 2020
Complement
~4,540 including air wing; roughly 500-900 fewer than a Nimitz (reported)

Program milestones

high

Publicly reported construction, test and deployment milestones for CVN-78.

2009-11Keel laid at Newport News

Construction formally begins on the first hull designed around electromagnetic launch and recovery, a new reactor plant and a smaller, further-aft island.

2013-11Christened

The ship is christened at Newport News; delivery slips repeatedly as EMALS, AAG, Dual Band Radar and the weapons elevators are developed concurrently with construction.

2017-07Commissioned

CVN-78 is delivered in May and commissioned in July 2017 with several new systems still incomplete, beginning an unusually long post-delivery test and trials period.

2020-05Record 167 launches and recoveries in a day

During carrier qualifications the ship exceeds the previous single-day mark of 135 traps set in January 2018, an early data point for the class sortie-rate argument.

2021-08Full Ship Shock Trials completed

Three live explosive events in the Atlantic validate the hull and new systems against underwater shock before the first operational deployment.

2021-12Eleventh advanced weapons elevator turned over

The last of the electromagnetic elevators, the most visible technical shortfall at commissioning, is handed to the crew four years after the ship entered service.

2023-10Surged to the Eastern Mediterranean

Ordered east after the 7 October attack on Israel, the strike group holds station off the Levant as a deterrent signal; the deployment is extended three times before returning on 1 January 2024.

2026-05Returns from a 326-day deployment

Sailing from Norfolk on 24 June 2025, the strike group moves from the Mediterranean to the Caribbean in November 2025 and on to the Middle East in February 2026, covering 57,713 nautical miles before returning on 16 May 2026 - the longest US carrier deployment since Vietnam.

Strategic significance

medium

CVN-78 was procured as a technology-forcing ship. Rather than introducing new systems incrementally across a class, the Navy matured EMALS, the Advanced Arresting Gear, the Dual Band Radar and eleven electromagnetic weapons elevators on the lead hull at the same time as it was being built. That choice is the main explanation for both the schedule slip between christening in 2013 and a genuinely complete ship around 2021-2022, and for an end cost near US$13.3 billion against an initial estimate closer to US$10.5 billion. The counter-argument, made consistently by the Navy and by supporters in Congress, is that the electrical margin from the A1B plant and the flexibility of electromagnetic launch are what allow the hull to absorb heavier unmanned aircraft, directed-energy weapons and sensors that a steam-catapult Nimitz cannot.

The operational record since 2022 has shifted that debate rather than settled it. The 2023 Eastern Mediterranean surge showed the ship being used exactly as a carrier is meant to be used politically - repositioned within days, held on station as a deterrent signal, and extended repeatedly because no substitute was available. The 2025-2026 deployment went further: 326 days, roughly 57,713 nautical miles, and three distinct theatres, from the Mediterranean to the Caribbean counter-narcotics build-up and then to the Middle East. Reliability that would have been questionable in 2018 was sufficient to sustain nearly a year at sea, which is the strongest available evidence that the class technology has matured.

The cost of that demonstration is now the open question. A deployment of that length consumes maintenance margin, crew retention and airframe hours faster than the planned cycle assumes, and the ship entered an extended maintenance period in mid-2026. For a fleet that is simultaneously trying to retire USS Nimitz, absorb delays on USS John F. Kennedy (CVN-79) and hold eleven carriers, availability rather than peak capability is the binding constraint. Ford's technical case is largely proven; whether the Navy can generate enough Ford-class deck time to matter against a peer competitor in the Pacific is a shipyard and sustainment problem, not an engineering one.

Videos

EMALS electromagnetic catapult dead-load testing aboard USS Gerald R. Ford (AiirSource Military)

Watch on YouTube

Timeline of the USS Gerald R. Ford's record deployment (13News Now)

Watch on YouTube

Inside CVN-78: how the Ford's 20 shipboard departments are organised (Bilibili)

Watch on Bilibili
Sources & References
UNITS
NameCountryStatusService YearDescription
USS Gerald R. Ford (CVN-78)
🇺🇸United States
ACTIVE2017 – PresentLead ship of Ford class, first new carrier design in 40 years