CVN-78 was procured as a technology-forcing ship. Rather than introducing new systems incrementally across a class, the Navy matured EMALS, the Advanced Arresting Gear, the Dual Band Radar and eleven electromagnetic weapons elevators on the lead hull at the same time as it was being built. That choice is the main explanation for both the schedule slip between christening in 2013 and a genuinely complete ship around 2021-2022, and for an end cost near US$13.3 billion against an initial estimate closer to US$10.5 billion. The counter-argument, made consistently by the Navy and by supporters in Congress, is that the electrical margin from the A1B plant and the flexibility of electromagnetic launch are what allow the hull to absorb heavier unmanned aircraft, directed-energy weapons and sensors that a steam-catapult Nimitz cannot.
The operational record since 2022 has shifted that debate rather than settled it. The 2023 Eastern Mediterranean surge showed the ship being used exactly as a carrier is meant to be used politically - repositioned within days, held on station as a deterrent signal, and extended repeatedly because no substitute was available. The 2025-2026 deployment went further: 326 days, roughly 57,713 nautical miles, and three distinct theatres, from the Mediterranean to the Caribbean counter-narcotics build-up and then to the Middle East. Reliability that would have been questionable in 2018 was sufficient to sustain nearly a year at sea, which is the strongest available evidence that the class technology has matured.
The cost of that demonstration is now the open question. A deployment of that length consumes maintenance margin, crew retention and airframe hours faster than the planned cycle assumes, and the ship entered an extended maintenance period in mid-2026. For a fleet that is simultaneously trying to retire USS Nimitz, absorb delays on USS John F. Kennedy (CVN-79) and hold eleven carriers, availability rather than peak capability is the binding constraint. Ford's technical case is largely proven; whether the Navy can generate enough Ford-class deck time to matter against a peer competitor in the Pacific is a shipyard and sustainment problem, not an engineering one.